Templeton Area Redevelopment Update

Construction Activities: Week of August 30 to September 10, 2021

Landscaping and work on the Aurora Connection continue over the next two weeks, along with miscellaneous concrete work. Learn more about what to expect during construction here. This week’s update, which covers the next two weeks follows below. There is no scheduled update the week of September 6.

OVERVIEW (new activity this week)

Landscaping and irrigation installations continue through September, and work on the new Miller Road/Aurora Connection intersection continues. For notice of specific activities over the next two weeks, please see detailed update below.

If you have questions about the project and would like to connect with our community liaison Pam by phone or in person, please email to [email protected] or call/text 604-561-2836.

WEEK OF AUGUST 30 TO SEPTEMBER 10, 2021: WHAT YOU CAN EXPECT 

Areas of focus over the next two weeks include:

New work:

  • Final concrete preparations, including Aurora intersection sidewalk letdowns and pedestrian bridge pads.

Continuing:

  • Place topsoil.
  • Install irrigation.
  • Aurora Connector electrical work.
  • Dust monitoring and watering as necessary.
  • Vehicles and equipment moving throughout the site.

Onsite equipment includes excavators, backhoe loaders, haul trucks, concrete trucks, compacting equipment, a forklift and a mobile crane. Broadband travel alarms are in use on regularly stationed equipment to reduce noise in the area. Traditional tonal alarms may still be heard on equipment and vehicles that travel to and from the site, or equipment that will be onsite for shorter durations.

HOURS OF OPERATION & SCHEDULED ACTIVITIES

Construction takes place Monday through Friday from 7 a.m. to 6 p.m. daily. Equipment and machinery are turned on after 7:30 a.m and most work is complete before sunset. An update will be provided if work is required outside of this timeframe.

Please note plans, activities and onsite equipment are subject to change based on evolving project needs and weather. Given the increased frequency of rain, workers may need to come to the site to monitor erosion and ensure the proper flood protections are performing adequately outside of the normal hours of operation.

NEED MORE INFORMATION? 

If you have any questions or comments about construction-related activities, please contact [email protected].

Check out previous construction updates here.

For more information or general questions about the Templeton Area Redevelopment Project, please visit yvr.ca/templeton.