Project: Joint Expansion Replacement

  • Summary: YVR is replacing the joint expansion curbside on level 3 of the International Departures (at the base of the tower). There will be several phases of work over the summer that will impact the Level 3 roadway and sidewalk.
  • Location: International Departures, Level 3
  • Anticipated Timeline: June - September 2022
  • What to Expect:
    • Intermittent noise during demolition at the start of each phase while the project removes the expansion joint in each of the areas.
    • We will experience lane closures on level 3 for the duration of this work June -September.
    • Road access and crosswalk access will be maintained at all times.
    • Drivers and pedestrians are asked to pay special attention to signage and traffic management in the areas. 

Project: Carousel 24 Replacement

  • Summary: YVR is replacing Carousel 24 in international arrivals level 2 which has now reached its end of life. This project will ensure that this critical asset can handle the return of passengers and bags in the post-pandemic era.
  • Location: International Arrivals Hall
  • Anticipated Timeline: June – October 2022
  • What to Expect:  All of the work will take place behind hoarding walls. Increased activity and some construction noise can be expected at certain hours of the day.

Bonus: Level 3 Curbside Signage Replacement

  • Summary: Finally, Starting June 20, 2022, departure level curb signs are changing. This will include changes to check-in areas. Passengers are requested to look up their flight number under the “Departing Flights” flight information to find their airline’s check-in counters and follow the signs in the terminal. 
  • Location: Departures, Level 3
  • Anticipated Timeline: June 2022
  • What to Expect:  Curb sign work from 8 p.m. to 4 a.m. with no anticipated impacts to operations.