There are several key projects currently taking place that will enhance the airport experience. This includes our biggest sustainability projects to date, new parking options, terminal expansions and much more. This is all possible due to our unique operating structure. The multi-year expansion project currently underway will help YVR meet growing passenger demand and better connect British Columbians and local businesses to the world, while improving the airport experience for everyone.

Terminal

  • There may be intermittent noise at U.S. check-in, U.S. pre-board screening area as well as U.S. Customs during daytime hours. This work is being done to improve our processes for transfer passengers. 
  • Construction for a new entrance to gate E85 is underway. Once complete in March 2020, it will connect passengers from Level 3 to the Level 2 remote stand operation (RSO) facility. This work includes the addition of new elevators and escalators.
  • As construction begins on a number of YVR’s new food and beverage and retail options, passengers can expect to see various hoarding around the terminal.
  • As part of the International Pier D expansion project, various work is taking place. This will take place airside and may include noisy work. Given that there is 24-hour operations in this part of the terminal, we understand that this could potentially be disruptive for those with flights at nearby gates. If you are looking for somewhere quiet, you can find seating in the creek area, near the food court.

In and Around Sea Island

  • Various work is continuing in the old Value Lot (adjacent to the Parkade) for the construction of a new six-storey parking lot and Central Utilities Building. A new toll plaza is now open and is the first permanent structure of the new Parkade. Please follow all directional signage in the area. There are also a number of related projects near by the site including: 
    • Work is taking place outside International Arrivals on level 2 in Chester Johnson Park. In order to facilitate the work, a section of the park is closed. The pet relief area and Japadog will remain in the current location.
    • A period of significant excavation from the project site has begun. In line with YVR’s commitment to sustainability and construction waste diversion, the valuable earthworks materials will be transported to an unused parcel of land south of the BCIT campus on Russ Baker Way. While there are no current plans to develop this site, this is an opportunity to re-use and recycle valuable materials to prepare the land for potential future development. This waste diversion project is expected to prevent more than 215,000 cubic metres of soil from landfill this year alone.
  • Construction is underway to prepare for Phase II of the McArthurGlen Designer Outlet Vancouver Airport. This phase is scheduled to open in Summer 2019 and will deliver 84,000 square feet of additional retail space.   
  • YVR is planning to redevelop approximately 44 acres of land on airport property in the Templeton area, adjacent to the Burkeville residential neighbourhood. The redevelopment will include a cargo and logistics facility and a linear greenspace for community use. Site preparation work is now underway to prepare the project site for redevelopment. 
  • Little Wings Daycare is relocating from their existing site to the south west corner of Miller Road and Templeton, adjacent to Sea Island Elementary and Park and Fly. This move is necessary due to their current lease ending. To prepare the area for this relocation, work includes preparation of a ditch crossing, as well as earthworks on the project site and installation of site services and utilities.   

Parking

  • A section of McDonald Road is closed for construction traffic only. This work is part of the project to extend the east apron for Remote Stand Operations. Please follow all directional signage to the new McDonald Road, located east of North Service Place.

For more information, visit yvr.ca/construction.

More posts from YVR Stories
  • YVR Stars

    Did someone at YVR go above and beyond for you today? Nominate a YVR Star and tell us your story.

    December 17, 2018

We use cookies to improve user experience, and by using this site, you consent to the use of cookies. Learn more and how to manage your preferences on our Privacy page.