Return to blog home

Posts

A-B Connector Project Video Series: Truss Delivery

Time to check back in on everybody's favourite airport improvement adventure: the A-B Connector project!

The A-B Connector project has already had some pretty cool components (intro, demolition, recycling), but this latest phase of construction saw some incredible feats of engineering and logistics with the delivery of giant steel trusses, each roughly the size of a Q400 aircraft. The video above shows the remarkable process and the incredible amount of planning, teamwork and ingenuity that went in to making sure that the steel behemoths were delivered safely.

Speaking of safety, a significant safety milestone was recently reached as the A-B Connector passed the 300-day mark without a single lost-time incident. That means not one day of work has been missed due to injury on the job site in that time. Safety is at the core of everything we do and we are thrilled to celebrate this landmark alongside our general contractor, Ledcor. Here's to 400!

Stay tuned for more updates on the A-B Connector project. Next up: Men of Steel.

Share
Add your comment Fields marked by * are required.
  •    
     
     
     
     
       
  • All comments are approved by a moderator before they are displayed.

Recent Posts

Please Upgrade Your Browser

This site's design is only visible in a graphical browser that supports web standards, but its content is accessible to any browser or Internet device.